BobC
5 August 2026 04:46
642
First started planning this table back in 2017. The top, made from 4 planks of quarter sawn Oak, commenced in 2020 and completed in 2021.
Now we’ve decided to stay in Dalton and repurpose the kitchen to include a small dining area, it’s time to get on and make it.
Opting for the Frenchman’s Cove design of Nakashimas’. Pile of Oak required, including the top…
18 Likes
BobC
6 August 2026 21:34
643
Feet and top supports cut to size, pile reducing.
10 Likes
BobC
9 August 2026 13:16
644
Proportions looking ok so on with shaping the lower foot. Then a pair of rebated halving joints top and bottom.
That’s a job for tomorrow.
11 Likes
BobC
13 August 2026 08:03
645
First two rebated halving joints underway, 8 to go after these.
9 Likes
BobC
14 August 2026 10:36
646
4 of the male halves of the rebate halving joints done, 6 to go. When complete I’ll use the router plane to accurately thickness the halving joint, then cut the U element of female ends.
6 Likes
BobC
20 August 2026 11:08
647
Two finished, running true and square.
12 Likes
BobC
22 August 2026 04:21
648
One leg done, on with the other…
12 Likes
BobC
28 August 2026 18:18
649
Setting the end overhang so i can proceed with the main stretcher housing joints.
This is just one half of the top. The width of 106cm allows for an easy 4 seater and a comfortable 6 without needing a table longer than 160cm.
A couple of weeks should see this completed, installed in October once the decorator has finished.
A spindle backed, splayed legged, Elm, two seater bench to make for one side… that’s the next project.
17 Likes
BobC
29 August 2026 19:11
651
9 rebated housing joints cut, one to go.
10 Likes
BobC
31 August 2026 20:50
652
One foot cut to shape, just final sanding and rounding over to complete, happy days.
However, a very stupid momentary lapse in concentration means that the other foot is scrap and will need to be remade. I used a couple of additional festool dominoes to help stabilise the lamination during glue up. They were shallow and would be undercut when the large taper was removed. I must have alerted the depth setting on this foot…fuuuuuuuck…
5 Likes
BobC
6 September 2026 09:01
654
And that’s how it should have been first time round!
18 Likes
BobC
13 September 2026 10:25
655
One leg shaped and glue up complete. On with the next
13 Likes
BobC
15 September 2026 10:16
656
5 min PU glue, a one man pitstop of a glue up.
Et voila
9 Likes
BobC:
5 min PU glue
You’ll be eating dinner off it tonight .
Bigrod
15 September 2026 11:34
658
Such is life .
Probably wasn’t your first and maybe not your last
BobC
15 September 2026 16:28
659
Just the pads too go either end of the rail, bit of shaping and then final glue up. Should have the frame finished tomorrow.
7 Likes
BobC
16 September 2026 19:53
661
All done ( upside down in shot). On with the top now.
15 Likes